The T Intermodal Transportation Center

2016-12-07T03:21:14-06:00

The Center is a collection of facilities for the transfer of passengers to and from different modes of transportation, and includes the Passenger Services Building, the Amtrak Services Building, the TRE and Amtrak Platforms, the bus transfer area, the "kiss and ride" drop-off area and the north and south pavilions.

Location: Fort Worth, Texas

Services Provided: Structural Engineering

Square Feet / Area: 33,500 Square Feet

Year Completed: 2002

Fairview Town Hall

2016-12-07T03:21:15-06:00

The roof was double-pitched with five to seven foot overhangs. At the second level there are two intermediate level roofs that overhang the entry on each side of the building. CGA also assisted landscape architects with the design of some of the structural elements, such as the trellis, retaining walls, and sidewalk elements.

Location: McKinney, Texas

Services Provided: Structural Engineering

Square Feet / Area: Four levels and underground parking

Year Completed: 2011

DISD Booker T. Washington High School

2016-12-07T03:21:15-06:00

An addition to an existing school building with new a performance hall, dance and rehearsal studios, library, paint and costume shop areas, support facility areas and full corridor atriums. The expansion was designed to architecturally reflect the surrounding Dallas Arts District.

Location: Dallas, Texas

Services Provided: Structural Engineering

Square Feet / Area: Five levels, including two below grade

Year Completed: 2006

DART SH-78 Freight Rail Bridge

2016-12-07T03:21:15-06:00

The new bridge was designed to replace an existing rail bridge that conflicted with the new DART Light Rail extension into Rowlett. The design was based on the AREMA 2009 Manual, Cooper E-80 loading and the DART Design Criteria Manual.

Location: Rowlett, Texas

Services Provided: Structural Engineering

Square Feet / Area: 124 Linear Feet

Year Completed: 2011

DART North Central and North East Light Rail Expansion

2016-12-07T03:21:15-06:00

CGA provided the structural design for 13 light rail stations for the Blue Line expansion. CGA developed the elevated stations' prototype and special use platforms to provide handicap accessibility to the stations.

Location: Richardson, Plano and Garland, Texas

Services Provided: Structural Engineering

Square Feet / Area: 13 Passenger Stations

Year Completed: 2002

Dallas Police Headquarters

2016-12-07T03:21:15-06:00

The facility consolidated 36 police functions, housing 1,365 employees. The rectangular building has a central core area for building services and a perimeter area for offices and support areas.

Location: Dallas, Texas

Services Provided: Structural Engineering

Square Feet / Area: 360,000 Square Feet

Year Completed: 2002

Dallas Love Field Apron Improvements

2016-12-07T03:21:15-06:00

CGA was the Prime Firm for two phases of improvements to aprons. Services included replacement of a continuous trench drain and pavement, including pavement with fiberglass dowels for the Compass Rose Apron.

Location: Dallas, Texas

Services Provided: Civil Engineering

Square Feet / Area: N/A

Year Completed: 2007

DISD North Dallas High School

2016-12-07T03:21:15-06:00

CGA provided the civil design of a new classroom wing and renovation of the existing structure; services inlcuded dimension control, a paving plan, drainage area map, grading plan, storm sewer plan, erosion control, water and sewer service plans, and the replacement of 850 square feet of concrete steps at the front of the building.

Location: Dallas, Texas

Services Provided: Civil and Structural

Square Feet / Area: N/A

Year Completed: 2005

Denton Downtown Transit Center

2016-12-07T03:21:15-06:00

The City rehabbed an historic building to serve as a new transit center. As the previous sanitary sewer line was of indeterminate age, the new extension was built as a precautionary measure. The project also included drainage, parking, paving, sidewalks, and hardscape.

Location: Denton, Texas

Services Provided: Civil Engineering

Square Feet / Area: N/A

Year Completed: 2011

Go to Top