Project Description
CGA supplied erosion control for site development, stone outlet protection of concentrated storm water flows, a stabilized construction entrance/exit, a silt fence, inlet protection, rock berms, erosion control blankets/matting for slope protection, mulching, seeding and sodding, sediment traps, compost/mulch sediment filter dikes, a dewatering sediment tank and stockpile protection. CGA also developed the storm water pollution prevention plan.
Location: Carrollton, Texas
Services Provided: Civil Engineering
Square Feet / Area: 6.6 acres
Year Completed: 2009